Beach Replenishment at Hillsboro Inlet, Florida
Ellicott cutter suction dredge sand dredging in the Inlet
Coastal Systems International evaluated the coastal processes influencing the inlet and developed a design for a channel deepening project at Hillsboro Inlet. The project involved the dredging of 300,000 cubic yards of material, a third of which consists of rock. the design will improve navigation and minimize impacts to long shore sand movement by allowing the channel to serve as a sediment trap, collecting southerly-moving material. Sand deposited in the channel will be mechanically bypassed using the district-owned hydraulic dredge built by Ellicott Dredges of Baltimore, MD. Permits were prepared for and secured from Broward County Department of Planning and Environmental Protection (DPEP) and the State of Florida Department of Environmental Protection (DEP) as well ast he Army corps of Engineers. Coastal Systems also secured partial funding for the Inlet Management Plan Addendum from the Florida Inland Navigation District (FIND) and the DEP. Dredging construction documents were prepaid using information collected from jet probes, hydrographic and marine resource surveys, and offshore disposal site video mapping. Dredging specifications were prepared and construction was completed in December 2003.
Construction administration services were provided, including dredging contract payment surveys. Coastal Systems also designed the near shore mitigation required due to environmental impacts from the dredging.
Client: Hillsboro Inlet District
Location: Fort Lauderdale, Florida
Initial Date of Completion: 2003
Construction Cost: $4,100,000
Note: The beach replenishment using the Ellicott cutter suction dredge is ongoing.
Source:www.coastalsystemsint.com
Find Products By
Type of Dredger Cutterhead Dredgers Swinging Ladder Wheel Dragon™ Coastal Dragon™ Jet Dragon™ Sandminer Large Custom Dredgers
Project Questionnaire
Learn About Dredging
Dredge Animations
Photo Gallery
Dredging Links
Job Openings
Ellicott Dredges, LLC
1425 Wicomico St., Baltimore, Maryland 21230 U.S.A.
Email:Sales Department
Toll Free: 888-870-3005 Phone (410) 625-0808 Fax (410) 545-0200 Affiliated Companies:
Copyright 2000- 2009, Ellicott Dredges LLC
|
|
|
Home
|
Dredge Products
|
Parts and Service
|
Case Studies
|
Dredge News
|
Your Dredge Project
|
About Us
|
Contact Us
Ellicott Case Studies
Beach Replenishment at Hillsboro Inlet, Florida
Ellicott cutter suction dredge sand dredging in the Inlet
Coastal Systems International evaluated the coastal processes influencing the inlet and developed a design for a channel deepening project at Hillsboro Inlet. The project involved the dredging of 300,000 cubic yards of material, a third of which consists of rock. the design will improve navigation and minimize impacts to long shore sand movement by allowing the channel to serve as a sediment trap, collecting southerly-moving material. Sand deposited in the channel will be mechanically bypassed using the district-owned hydraulic dredge built by Ellicott Dredges of Baltimore, MD. Permits were prepared for and secured from Broward County Department of Planning and Environmental Protection (DPEP) and the State of Florida Department of Environmental Protection (DEP) as well ast he Army corps of Engineers. Coastal Systems also secured partial funding for the Inlet Management Plan Addendum from the Florida Inland Navigation District (FIND) and the DEP. Dredging construction documents were prepaid using information collected from jet probes, hydrographic and marine resource surveys, and offshore disposal site video mapping. Dredging specifications were prepared and construction was completed in December 2003.
Construction administration services were provided, including dredging contract payment surveys. Coastal Systems also designed the near shore mitigation required due to environmental impacts from the dredging.
Client: Hillsboro Inlet District
Location: Fort Lauderdale, Florida
Initial Date of Completion: 2003
Construction Cost: $4,100,000
Note: The beach replenishment using the Ellicott cutter suction dredge is ongoing.
Source:www.coastalsystemsint.com
Find Products By
Type of Dredger Cutterhead Dredgers Swinging Ladder Wheel Dragon™ Coastal Dragon™ Jet Dragon™ Sandminer Large Custom Dredgers
Project Questionnaire
Learn About Dredging
Dredge Animations
Photo Gallery
Dredging Links
Job Openings
Ellicott Dredges, LLC
1425 Wicomico St., Baltimore, Maryland 21230 U.S.A.
Email:Sales Department
Toll Free: 888-870-3005 Phone (410) 625-0808 Fax (410) 545-0200 Affiliated Companies:
Copyright 2000- 2009, Ellicott Dredges LLC
Beach Replenishment at Hillsboro Inlet, Flori...
Beach Replenishment Topsail Beach - Ellicott ...
Beach Replenishment in New Jersey - Ellicott ...
Beach Dredging - Beach Restoration - Beach Ma...
Beach Management - Ellicott Dredges
Sebastian Inlet dredging starts - Ellicott Dr...
Reinforce Eroded Beach - Ellicott Dredges
At Seventeen
AT命令
At Seventeen
AT December
at weekend
雷人的英文版《上海滩》The Beach of ShangHai
NewAge音乐】黛安妮海滩的旋律 Diani Beach Lounge
City of Virginia Beach Erosion Council Buys E...
《沙滩上的钢琴》(Piano On The Beach)
美丽假期---在马尔代夫【Vilu Reef Beach & Spa Resort】
驰放新碟:VA_Brazilian Beach: Copacabana - Lounge Series Vol.01 (2010/MP3)
PATONG BEACH酒吧实拍 看看ladyboy有多性感
Dict.CN: play at
Cats at Kontraband
Violette Szabo at AllExperts
50.At the Zoo
Invention at Play